Skip to content

Risk Management

Overview

Structured risk management workflow compliant with ISO 14971 and EU MDR requirements.

Available on: All plans

Capabilities

ModuleDescription
Hazard IdentificationSystematic identification of device-related hazards
Risk EstimationSeverity and probability assessment
Risk ControlsDefine control measures
Residual RiskPost-control risk evaluation
RCM TraceabilityRisk Control Measures traceability matrix
Risk ReportComplete risk management documentation

Workflow

  1. Hazard Identification -- AI identifies potential hazards based on device type and intended use
  2. Risk Estimation -- Severity (S1-S5) x Probability (P1-P5) matrix
  3. Risk Controls -- Design elimination, protective measures, safety information
  4. Residual Risk -- Acceptability assessment after controls

Risk Matrix

ISO 14971 aligned 5x5 risk matrix (customizable per project):

P1P2P3P4P5
S5LowMediumHighHighHigh
S4LowMediumMediumHighHigh
S3LowLowMediumMediumHigh
S2LowLowLowLowMedium
S1LowLowLowLowLow

Risk levels (Low / Medium / High) are determined by the Severity (S) and Probability (P) combination. The matrix can be customized in the risk management configuration after project creation.

Integration

Risk management data automatically links to:

  • GSPR Compliance: Referenced as GSPR 1-3 conformity evidence
  • CER: Safety analysis references risk controls

Output Documents

  • RCM (Risk Control Measures) traceability matrix
  • Risk Management Plan (RMP)
  • Risk Management Report (RMR)